- Bribe Fighter
- 14 years ago
- 4528 views
For last one year supply by temp. wire
Without checking the cable fault The officials orally asking me 50 meter cable and other materials without a written order for reconnection through the roadside. As it is not my duty, I refused to supply the cable. So for the last one year we get the power supply by temporary wire from the next building.